Where the high water-mark is required and the survey is made during a period of low water. Value Step one, Pair of Ranges. Control Line One. Control Line Two. Control Line Three. Control Line Four. traverse on all the Topography. Locke level or Clinometer Elevation & Distance. Locating Contours by the Hand The work is …